|
0
أخرى
|
|
|
|
|
|
|
العائد السنوي |
USD 5 Million - USD 25 Million |
|
|
|
|
العنوان |
2/C/1, PICNIC GARDEN 3RD LANE
KOLKATA - 700039 |
|
|
|
نبذة عن الشركة |
Conceived in 1975 for turbine services Turbo Engineers (TE) has under taken over last 40 years numerous turnkey erection, overhauling, retrofitting and upgrading of steam turbines, turbo generator, turbo compressors, turbo blowers, turbo feed pump sets etc through out India and overseas.
TE has grown and diversified into spare supply including reengineering & manufacture of component, turbine blades & spares and completed type of works including re blading and balancing of rotor nozzle block, diaphragms, labyrinth packing, etc of many make of turbine and buying and selling of used / refurbished machines and sale of new machines.
TE also undertake maintenance and overhauling of turbine auxiliaries including condenser re tubing etc on turnkey basis on schedule. We have the track of finishing different packaged on record time in India and overseas. To site one, we have completed retubing of 14,000 tubes in one of 140 MW condenser of DVC within 33 days
We have worked across most of the industries in India including – SAIL steel plants at different locations, State Electricity Boards, Bharat Heavy Electricals, Bharat Cooking Coal Ltd, different Chemical plants, Paper Mills, Sugar Mills, Milk Food Plants, Aluminum companies, Smelters etc,
We have track record of delivering a quality service (hundreds of contracts) on schedule and have numerous appreciation certificates from all the companies over the years. Given below some of the organizations who may be enquired for quality of our service
TE has in house testing wing which is manned by qualified, trained and well experienced engineers and equipped with all requisite testing equipment/instruments for testing. The engineers are trained at the works of the leading manufacturers of turbines sets. TE has well organized design facility including computer aided micro-station re engineering facilities. TE has well equipped workshop with all latest machinery required for most of the refurbishment work. We have very close link with associated companies having special facilities for higher size machines and can organize vibration analysis balancing after retrofitting etc.
Kindly note that we are undertaking EPC CONTRACT FOR NEW COAL FIRED POWER PLANT = STEAM TURBINE
and WOOD CHIP / BIO MASS POWER PLANTS
|
|
|
|