Pioneer Unit for sulfur removal from well water – designed by Al Kindy State Company | ||
28/03/2013 | ||
General Director of the company, Engineer Yousif Hussein illustrated to MIM bureau that the success of this project will help the Nineveh province significantly. The presence of the sulfur in this province is higher in terms of number and the contraction is around 60-170 ML each liter. The newly designed pioneer unit works 3 m3 per hour jumping to increase the production capacity to 6 m3 per hour. It can run through the use of solar energy. | ||
Last Update:: 28/03/2013 | ||
Iraq Directory |